Educational systems can operate on limited budgets with demanding timelines and require our work to not impact their student activity. Students, faculty, and administrators expect comfortable and reliable campus environments that enhance their learning capabilities. Administrators are driven to provide that comfort with an eye to longevity. There is a delicate balance between budgets, comfort and a long-term investment in more energy-efficient systems and equipment.
We understand all of these dynamics as well as the need to provide the best service available. From small plumbing jobs to renovations and even to new facilities, we want to be a resource for you.
Case Study
Scope: underground drainage piping, Installed overhead plumbing systems: natural gas, compressed air, domestic water, sanitary vent piping, domestic water booster pumps system.
Case Study
Scope: HVAC - Removed and installed new Boilers with filters back to BMS
Case Study
Scope(s) include: Chiller Change-outs, Pool Equipment Change-out, AHUs Change-outs and New Gym Ductwork, RTUs Change-outs and New Locker Rooms Ductwork. We have been working for the school district since 2019 on Phase 3. We completed Phase 4 projects in 2021 and are currently working in Phase 5 projects in 2022.